Advantages of floor coating
✔ Wear-resistant
✔ Good resistance to moisture and chemicals
✔ Suitable for all spaces: from a garage or workshop to a home, store or office
✔ Easy to maintain
✔ Available in more than 300 RAL colors
Supplies
Floor System
Epoxy primer
✔ Epoxy floor coating (optional multiple layers)
✔ PU topcoat (matte finish coat)
Preparation of substrate
✔ Sander or angle grinder with diamond bowl
✔ Construction vacuum cleaner
✔ Tape
Application of primer and PU screed
✔ Gloves (1 pair per layer)
✔ Mixing bucket (1 per layer)
✔ Mixing rod
✔ Drill or mixer
✔ Brush (1 per layer)
Nylon roller for epoxy primer
✔ S moothing trowel and/or tooth trowel
PU roller for PU topcoat
✔ Roll bar
✔ Optional: does it involve a large space? Then use a floor squeegee to distribute the primer
✔ Optional: jean shoes leave a minimal imprint on the PU screed.
We recommend applying the floor coating with 2 people, as the processing time of the product is 20 minutes.
Additional options/layers
✔ Anti-slip: a safe floor thanks to our anti-slip floor coating.
✔ Matte: give your floor an extra matte look with our PU topcoat.
✔ Color flakes: for a floor with a playful effect.
✔ Transparent: a floor with a transparent top layer.
Disclaimer: The application of paint products is always your own responsibility. We deem that the application/processing of the products ordered by you, is carried out by or under the guidance of a professional/experienced expert and that the person makes himself acquainted with our manual and MSDS.
Preparation
Before you get started with applying living concrete, you need to make the following preparations:
Check the packaging
The primer and equalizer consist of 1 component. Read through the text on the can and check the item number to see if the name matches the contents.
Check the substrate
Before you begin, the substrate must meet the following 4 conditions:
1. The subfloor must be (chemically) cured
For every inch that a new subfloor is thick, you should count 1 week of drying time.
2. The subfloor must be dry
The maximum moisture content depends on the type of substrate:
✔ Concrete: <4%
✔ Sand Cement: <2.5%
✔ Gypsum-bound: <0.5%
You can promote the drying process of an anhydrite subfloor by sanding off the andhydrite skin.
Do you have an underfloor heating system? Then follow the stoking protocol.
3. The subfloor must be level
Damage to the subfloor should be repaired and paint and glue residues sanded away. We recommend the following products for this purpose:
Small cracks and unevenness: epoxy putty
Larger holes: epoxy repair mortar
Openings along skirting boards, sills and heating pipes: acrylic sealant
4. The substrate must be clean and grease-free
In order for the living concrete to adhere, the substrate must be grease-free.
✔ Grease and oil spots: sprinkle cat litter on these. These suck up the fat.
✔ Stubborn stains: use POWER cleaner and/or ammonia.
✔ Dust and dirt: with a vacuum cleaner and a soft broom, make the floor dust-free.
✔ Cement slurry: the substrate may still have a so-called cement slurry. Remove these with a diamond sander.
Conditions for the environment
The conditions in which you process the living concrete must be optimal in connection with the shelf life and reaction of the materials. Therefore, please consider the following:
The right temperature:
✔ Minimum: 15 °C
✔ Maximum: 30 °C
✔ Optimum: 20 °C
Proper humidity:
✔ About 80%
NB! The processing time for the materials is about 20 minutes!
Set up a separate workspace
Create a separate work area, preferably outside the space where you will be applying living concrete. Cover the floor with a tarp or stucco pad so you can work cleanly. This is to prevent you from spilling loose components onto the subfloor.
Tape everything
Are there walls, table legs or other objects that should not have living concrete on them? Then tape these off.
Divide the space
Make a plan of action and divide the space in your mind according to the amount of material in the cans. In fact, the content is suitable for a limited number of square meters. That way you know how thick to apply the equalizer.
Get everything ready
Have you checked off the checklist? Prepare all materials and tools. Are you working with two people? Then divide the tasks.
Application of floor coating
Drying time:
You can apply the next coat after 18 hours and within 36 hours.
Is it later than 36 hours? Then sand the floor in between.
NB! The processing time for the materials is about 20 minutes!
Total time:
Count 1 layer per day.
Roadmap:
Day 1: Apply the primer layer
1. Mix components separately with a mixing rod. Is the product in a jerry can? Then shake these.
2. Pour component A + B together and mix for 3 minutes.
3. Transfer everything to a clean bucket, mix again for 1 minute.
4. Start by applying the primer coat at the edges. Do this with a brush or small roller.
✔ 5. Pour the primer in strips and then roll it out.
6. Next coat: after 18 hours and within 36 hours.
NB! The processing time for the materials is about 20 minutes!
Day 2: Apply the floor coating
7. Mix components separately with a mixing rod.
✔ 8. Pour component A + B together and mix for 3 minutes.
9. Transfer everything to a clean bucket, mix again for 1 minute.
10. Start by applying the coating at the edges. Do this with a brush or small roller.
Section 11. Pour the remaining material into strips. Roll out crosswise for even results.
12. Next coat: after 18 hours and within 36 hours.
Do you want to apply a third coat of floor coating? Then on day 3, go through the same step-by-step plan as on day 2.
NB! The processing time for the materials is about 20 minutes!
Curing
Temperature – Light load – Full load
15 °C – 3 days – 10 days
20 °C – 2 days – 7 days
Watch our instructional video
On Flowresin’s YouTube channel you’ll find a handy instructional video where we explain how to apply a floor coating.
Maintenance
Visit the flowresin.com website for complete cleaning advice. You can also order special cleaning products from us.
Questions?
Do you have questions about floor coating? Please refer to the product information sheets on our site or go to our Frequently Asked Questions section.
Can’t find an answer to your question? Then get in touch with us. The experts at Flowresin.com are ready for you!
Disclaimer
Because our products are mostly applied under conditions beyond our control, the application of paint products is always your own responsibility. Our advice regarding application is given to the best of our knowledge and is considered to be only non-binding instructions. We cannot guarantee more than the quality of the product itself. We deem that the application/processing of the products ordered by you, is carried out by or under the guidance of a professional/experienced expert and that the person makes himself acquainted with our manual and MSDS.